亚洲精品真人中文真人片_在线视频播放大全_天天综合视频网_中文字幕无码精品2020_AV大片在线无码免费_尻逼视频软件_精品国产不卡在线观看免费91_亚州av秘 无套一区二区_久久97国产超碰青草_91亚洲理论午夜

pe pipe production line

categories of news

Product Categories

hot key words

contact us

Zhangjiagang city Jurun Machinery Co.,Ltd.

Contact: Mr. Cai

Mobile:13801567009

               15262324740

Tel:0512-58579588

Fax:0512-58535865

E-mail:cbb7009@163.com

              Bosh@conboplas.com

Web:pellico.com.cn

Add:Dengquan,Leyu Town,Zhangjiagang City,Jiangsu Province,China



Notice for operation of extruder in plastic pipe production line

Your current location: Home >> News >> Company news

Notice for operation of extruder in plastic pipe production line

Release date:2017-07-03 Author:http://pellico.com.cn/en Click:

Plastic pipe production line equipment has a control system, and then through the extruder, machine head, stereotypes cooling system, traction machine, cutting equipment and turning rack composition. The extrusion principle of extrusion machine is the use of screw thread with inclined rotating in the cylinder heating in the hopper brought forward plastic extrusion, plastic gradually heating, uniform plasticizing plastic extrusion molding, and through the nose. In the actual operation of the extruder, pay attention to a few points:

1 before starting, check whether the heating ring is good, whether the thermocouple is inserted and the temperature is accurate

2. start when the heating temperature to set the process temperature, and heat insulation for a certain period of time before starting. To prevent the motor, screw and other parts damaged.

3. host must first start running at low speed for several minutes, will melt the barrel last remaining drained, to melt pressure and current stability after the host material spraying speed, so as to avoid hurting people.

4. equipment operation should observe the temperature, current, melt pressure and other parameters at any time. And observe the heating situation of the motor and reducer, and find out the cause in time and eliminate it when there is abnormal


QQ圖片20170522132929.png

5. heating time, depending on the size of the nose, 63 machine head is not less than 3 hours, 250 head is not less than 6 hours, 450 head is not less than 8 hours

6., the choice of mold: according to product specifications to choose the appropriate mold, if the mold selection is inappropriate, it will bring difficulties to production

7. plastic pipe production line mold protection: the quality of the mold determines the quality of the product, the mold material is generally die steel, surface chrome treatment, hardness difference. Therefore, in the disassembly and handling process must be protected, there is no scratches and collisions. The general mold can not be placed directly on the ground, should be put on rubber or woodwind is appropriate. Do not strike with a solid sharp tool when replacing the mold.

8. core concentricity adjustment: core mould production line of solid wall pipe for the regulation of the follow the "loose thin Dinghou" principle. It is to loosen the screw in the small direction and tighten the screw in the big gap direction.

9. heating ring protection: in general, the heating coil life is very long, often in the process of disassembly damage, therefore, the heating ring in the demolition process should be extra careful.


Related tags:pipeproductionline

Recently Viewed:

S
e
r
v
share